Project Highlights

 

Pico Rivera

Water Plant No.3 Electrical Upgrades

Yao Engineering designed a new electrical distribution system and SCADA upgrades including: Service Entrance Rated Switchboard 480Y/277V, 1600A Distribution Switchboard Five (5) Variable Frequency Drives 480Y/277V, 600A Motor Control Center 75kVA Transformer 208Y/120V, 200A Lighting Panel Control Panel with Programmable Logic Controller

Pasadena Water and Power

Arc Flash Study

 

Southern California Gas

EV Charging Stations

 

Los Angeles Department of Water and Power

Owens Lake